Boxdin
Vanning.com logo
We host with and recommend Your-Site.Com - This site works best with FireFox - this site is powered by UBBCentral



Site Navigation


Advertisements
Recent Posts
Stinger / Intech Wire Management Clips
by Ram4ever
2 seconds ago
** PARK THE VAN ** -- Free Video Game I made re CUSTOM VANS
by kursed
50 minutes 35 seconds ago
Beast of a Van in Centralia WA
by kursed
53 minutes 46 seconds ago
Help Me Rescue This Van
by kursed
55 minutes 31 seconds ago
Natural State at the moment.
by Ram4ever
Today at 12:16 AM
econolines.ipbhost.c
om SUSPENDED

by nautic1
Yesterday at 11:25 PM
Howdy you wonderful freaks!
by frscke1
Yesterday at 10:52 PM
Pacific NorthWest - ALL VAN MEET UP - July 26 2014
by Hicks
Yesterday at 10:48 PM
My Humble Opinion As To Vanning After Being Absent For 25 YEARS:
by wookee
Yesterday at 10:01 PM
Need ARTISTIC help. . . .
by Uncle_Fester
Yesterday at 09:44 PM
Featured Links


-->
Cluster Map
Locations of visitors to this page
Page 2 of 2 < 1 2
Topic Options
Rate This Topic
#26589 - November 07th 2005 4:06 pm Re: Winter work list
wookee Offline
carpal tunnel

Registered: April 14th 2003 12:00 pm
Posts: 7531
Loc: Joppa Md. U.S.A.
finish bathroom from hell project.

Get 93 GMC put back together and out of the garage

Install new electronic speedo and new gas gauge in the "Beast"

Have all of the leaf springs rebushed and de arched.

Smooth out rear end and a fresh coat of primer before Spring Thaw.......

Thats enough.Just wtiring about it makes me tired. I am going to go take a nap........Wookee

<small>[ November 07, 2005, 04:11 PM: Message edited by: wookee ]</small>

Top
AdSense
#26590 - November 07th 2005 9:54 pm Re: Winter work list
VanVida_Israel Offline
pooh-bah

Registered: December 21st 2002 12:00 pm
Posts: 3571
Loc: KS
wookee..de-arch the leaf springs..way to go..I like that..Praise the Lowered..

Top
#26591 - November 08th 2005 12:45 am Re: Winter work list
Sledgehammer Offline
addict

Registered: December 07th 2003 12:00 pm
Posts: 364
Loc: Marysville WA.
Well I want to finish removing the interior,
Install new floor, After sealing holes in floor.
Install insulation & sound deading material.
Re-install 3/4" MDF lower walls.
Rebuild speaker towers to add 10" subs, Install.
Reinstall old bed set-up with some changes!!
Some of those changes are; Use 3/4" MDF to replace 1/2" so I can remove some other supports.
Cut-outs in inner bed walls to install plexi to view amps,caps,dist blocks ect.
Change 12 disk CD changer mounting for better access to change disks.
Add gas cylenders to hold hinged bed up.

Then install new upper walls, new door panels Recover headliner, replacing wood support strips with polished stainless.
Also new carpet, seats ect..

Can't forget the new head unit with DVD playback and two 7" moniters, 30 band EQ, Add at least two more batteries and 200 amp alt.

Oh yea, Speaker towers will get the fibreglass treatmeant along with some of the other MDF. All MDF will get multible coats of primer/sealer, before paint or cover treatment.

Should keep me busy....

Top
#26592 - November 08th 2005 1:42 am Re: Winter work list
monsterbox Offline
old hand

Registered: July 29th 2004 12:00 pm
Posts: 943
Loc: Tacoma, Wa
My GMC is getting the treatment this winter.

*new engine - mild built 350
*new tranny - 700r4 (overdrive)
*new radiator
*upgraded sound system
*new guages

After this I should be about out of money, but next on the list is new suspension, posi rear, and to lower the van. Should keep me busy.

Top
#26593 - November 08th 2005 3:33 am Re: Winter work list
mattmansrus Offline
member

Registered: September 17th 2005 12:00 pm
Posts: 128
Loc: Yakima Wa
finish body filler and sanding on all speaker pods, high build primer, stretch and maybe glass sub towers for the 4 12's build a boxfor the 4 batteries and a bench over top. plan out the workings of the bed. sound deadening on all walls and celing. buy a couple of mono block sub amps, the indash dvd player from alpine, maybe the lcd tv...purchases start next weekend
problem is i go to school 5 days a week in one city, and work an 8 hour shift 3 days a week in another city...wait,that makes an 8 day week with full time student and part time installer. o ya, i want to finish my truck. heh, i can sleep when im dead

Top
#26594 - November 08th 2005 8:32 am Re: Winter work list
GEORGI Offline
old hand

Registered: January 26th 2005 12:00 pm
Posts: 1398
Loc: NY
HMMM FINISH BODY WORK ON MID OH YEAH GET IT RUNNING PAINTED AND STREET ABLE THEN MAYBE CHANGE REAR GEARS TO 3.50 ON THE 76 INSTALL A NEW MOTOR CHANGE DOORS AND FINISH THE INTERIOR WORK THERES LOTS OF THINGS THAT NEED TO BE DONE BUT LITTLE MONEY AND NOT ENOUGH TIME.

Top
Page 2 of 2 < 1 2

Moderator:  Lil_Ed, nautic1 
Upcoming Events
AdSense
Instagram Feed
Who's Online
0 registered (), 2 Guests and 10 Spiders online.
Key: Admin, Global Mod, Mod
Newest Members
IRIEMON, roostervanner, DCPDGUY, VanManDan345, EricS
7864 Registered Users
Top Posters (30 Days)
Reed 97
lukester 93
newkirkinc1 84
HighwayStar 75
MACE 70
jules73 70
kursed 69
al55 67
Captain_E 61
cjhardcore 59
Forum Stats
7864 Members
70 Forums
30694 Topics
467187 Posts

Max Online: 177 @ May 08th 2013 5:58 am

This site works best with
Download Firefox